80 Kg ECS, ( RTI80)

1. Combustion Chamber
Material : Non-Corrosive Cylindrical Chamber
Thermal Insulation : A)Inner phase: Premium Curved Fire Brick & Ceramic Clay Coating    B)Outer phase: with 50mm thick glass wool
C)Protected with 1.0mm thick Aluminium plate
Dimension : Dia. 800mm, height: 1200mm, thickness: 8mm. (Cylindrical Part only.Upper and bottom conical area not included)
Erection : Erected upon four legs made of high quality TATA steel pipe of dia 82mm and thickness  10mm. at 1000mm above ground level
Other Features : Waste loading door, peep hole, ash chamber with door
Volume : 0.80 cubic meter
Capacity :Approx 80kg/hour 400kg/day
Efficiency : 99.3%
Fuel Consumption : NIL

2. Chimney
Material :TATA Seamless pipe schedule 40 Grade C
Dimension : Dia: 200 mm , Thick: 8.38mm
Effective Height : 14 mtrs from ground level
Emission Control Devices : NIL
Water consumption : NIL
Additional features :
1. Port hole and access ladder for routine maintenance and Emission tests.
2. Specially designed diffuser prevents rain water entering the Chamber

3.SCRUBBER
Material : High quality Original Stainless Steel
Dimension : Width: 900mm, Height:- 160mm
Cylinders : Primary: Carbon steel
Secondary:-Stainless steel with 20mm Thickness
Emission Control Device : Secondary burning with the help of additional air inlet tubes
Assembly : Errected on supporting legs of 5mm thickness
Additional features :
1. Port hole access ladder for routine maintenance and Emission tests.
2. Specially designed diffuser prevents rain water entering the chamber
3. Advance water spray in inside of chamber

4.CONCRETE PLATFORM:
Cement concrete platform of size 2m x 2m with 10cm thickness in mix 1:2:4 with nominal reinforcement of 6mm dia. at 20x20cm. C/c. upon a firm level surface preferably 1 foot above ground level. To be provided by the client prior to the installation.

5.SCOPE OF THE WORK
1. Supply, loading, unloading and erection of the equipment at the proposed site
2. Installation, trial run and commissioning.
3. Provide training to the client’s staff for proper operation of the equipment.
4. Provide 2-year onsite replacement warranty to the equipment.
5. Provide routine checkup every 90 days
6. AMC facility subsequent to warranty expiry.